EOT Crane Inspection Checklist
Company Name :
Date of Inspection :
Make :
Model :
Number :
Owned/Hired/Contractor :
EOT Crane Inspection Check Points:
| SN | Details |
| 1 | EOT crane should be physically in good condition, free from defects and should have valid TPI. |
| 2 | Railing should be in good condition and free from obstruction. |
| 3 | Power cable should be free from defect and organized. |
| 4 | Safety latch in hook and in working condition. |
| 5 | Marking of safe working load at proper place and should be visible. |
| 6 | Wire rope or sling should be free from defects and tested properly. |
| 7 | Coverage of rotating parts properly with machine guarding. |
| 8 | Audible horn should be available and in working condition. |
| 9 | Load Chart Available at proper place. |
| 10 | Deflection Test Should be carried out for smooth operation. |
| 11 | Remote should be in good and working condition. |
| 12 | Operator should have suitable and valid license. |
| 13 | Provision of safe access and egress. |
| 14 | Operator should wear all required PPE while operation, also need to ensure safe movement and no one beneath the working area. |
| Inspection Done By: |
| Name: |
| Department: |
| Designation: |
| Signature: |
| Date: |
| Review Done By: |
| Name: |
| Department: |
| Designation: |
| Signature: |
| Date: |