Gas Cutting Set Inspection Checklist

Gas Cutting Set Inspection Checklist

Company Name                     :
Date of Inspection                 :
Make                                       :
Model                                     :
Number                                  :
Owned/Hired/Contractor      :

Check Points for inspection of Gas Cutting Set:

SNDetails
1Cylinder should always be kept in trolley.
2Always keep cylinder in upright position and secured.
3Always ensure valve protection cap with it.
4Regulator should be of standard and free from defect.
5Pressure gauge should be in good condition, without any defect.
6Hose pipe is in good condition and colour coded as per standard.
7Joint should be tight enough and without any defect.
8Must use Industrial clip for fitting.
9Flash back arrestor should be provided at both end (At cylinder pressure gauge and at torch hose pipe).
10Always use industrial type lighter (No matchbox / Commercial Lighter allowed)
11Proper Personal Protective Equipment-PPE should be used while use for e.g., Safety Goggles, Leather Apron, Leather hand gloves, etc.
12Torch should be in good condition, without any defect.
13First Aid Kit and Fire Extinguisher should be available at work place.
14Provide booth if required. Refer image in box for ideal Gas Cutting Station.
15Competent person only should carry out gas cutting work.
correct and safe oxygas welding station Global EHS
correct and safe oxygas welding station Global EHS
Fit for use: Yes/No
Inspection Done By:
Name:
Department:
Designation:
Signature:
Date:
Review Done By:
Name:
Department:
Designation:
Signature:
Date: