Concrete Pump Inspection Checklist
Company Name :
Date of Inspection :
Make :
Model :
Number :
Owned/Hired/Contractor :
1 | Concrete Pump should be physically sound and in good condition. |
2 | Tire should be free from damage. |
3 | All Rotatory part should be covered with fixed guard. |
4 | Outrigger should be in working condition and free from damage. |
5 | Emergency Stop button should be checked and in working condition. It should be clearly marked and identifiable. |
6 | Panel should be covered properly. |
7 | Hopper should be in good condition. |
8 | Suitable mesh should be available at hopper to avoid contact with moving part. |
9 | Hook should be proper and in good condition which can withstand while shifting of Concrete pump. |
10 | All pipe joint should be tight with the help of proper clamp. |
11 | In case of electricity operated, electrical connection should be taken properly and machine should be grounded. |
12 | Operator should be competent and authorised. |
13 | All pipes to be used should be free from damages and physically sound. |
Fit for use: Yes/No |
Inspection Done By: |
Name: |
Department: |
Designation: |
Signature: |
Date: |
Review Done By: |
Name: |
Department: |
Designation: |
Signature: |
Date: |
Click here for more checklist…
Inspection checklist by Global EHS are as such so that we can use it for general safety inspection of the workplace or equipment.