Winch Machine Inspection Checklist
Company Name :
Date of Inspection :
Make :
Model :
Number :
Owned/Hired/Contractor :
Winch Machine Inspection Checkpoints:
SN | Details |
1 | Winch Machine should be physically in good and working condition and certified by competent person. |
2 | Remote control should be connected properly and Emergency switches should be in working condition without delay. |
3 | It should be fixed properly with suitable hard support. |
4 | Sling knot should be proper and without any defect. |
5 | Wire sling should be free from damage and corrosion. |
6 | Roll drum should have sufficient space to roll in full slings. |
7 | Hook should be with safety latch only, |
8 | Cover Rotating part with fixed guard. |
9 | Power cable should be free from damages and take connection through industrial plug only. |
10 | Only competent person shall operate Panel. |
11 | Panel checking and inspection on regular basis as per schedule. |
12 | Must use proper PPE (Personal Protective Equipment) while operating panel. |
13 | Winch machine should be grounded properly. |

Fit for use: Yes/No |
Inspection Done By: |
Name: |
Department: |
Designation: |
Signature: |
Date: |
Review Done By: |
Name: |
Department: |
Designation: |
Signature: |
Date: |
Click here for more checklist…
Read more about below topics and also visit out video galary to see safety videos.